{"id":78311,"date":"2024-11-28T16:33:58","date_gmt":"2024-11-28T13:33:58","guid":{"rendered":"https:\/\/www.kfm.co.ug\/?p=78311"},"modified":"2024-11-28T16:33:58","modified_gmt":"2024-11-28T13:33:58","slug":"lubowa-hospital-construction-45-complete-health-minister","status":"publish","type":"post","link":"https:\/\/www.kfm.dembefm.ug\/staging_h\/lubowa-hospital-construction-45-complete-health-minister\/","title":{"rendered":"Lubowa hospital construction 45% complete &#8211; Health minister"},"content":{"rendered":"<p>The Ministry of Health has announced that the construction of the International Specialized Hospital of Uganda at Lubowa is currently 45% complete.<\/p>\n<p>In 2015, the government contracted an Italian company to design, finance, construct, and equip the mentioned hospital.<\/p>\n<p>On Thursday afternoon, while presenting the Ministry of Health&#8217;s 2021-2026 Manifesto implementation status at the Prime Minister&#8217;s office, Dr. Ruth Aceng, the Minister of Health, disclosed that construction work is progressing well, with the building currently reaching the sixth floor.<\/p>\n<p>&#8220;The construction of Lubowa International Specialized Hospital is ongoing at about 45%. We are on the sixth floor and you are welcome to go and see,&#8221; Dr Aceng said.<\/p>\n<p>She assured the public that the project would soon be completed, enabling Ugandans to access high-quality medical services.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Ministry of Health has announced that the construction of the International Specialized Hospital of Uganda at Lubowa is currently 45% complete. In 2015, the government contracted an Italian company to design, finance, construct, and equip the mentioned hospital. On Thursday afternoon, while presenting the Ministry of Health&#8217;s 2021-2026 Manifesto implementation status at the Prime Minister&#8217;s office, Dr. Ruth Aceng, the Minister of Health, disclosed that construction work is progressing well, with the building currently reaching the sixth floor. &#8220;The construction of Lubowa International Specialized Hospital is ongoing at about 45%. We are on the sixth floor and you are welcome to go and see,&#8221; Dr Aceng said. She assured the public that the project would soon be completed, enabling [&hellip;]<\/p>\n","protected":false},"author":19,"featured_media":72638,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"episode_type":"","audio_file":"","cover_image":"","cover_image_id":"","duration":"","filesize":"","date_recorded":"","explicit":"","block":"","filesize_raw":"","jnews-multi-image_gallery":[],"jnews_single_post":{"format":"standard","override":[{"template":"1","parallax":"1","fullscreen":"1","layout":"right-sidebar","sidebar":"default-sidebar","second_sidebar":"default-sidebar","sticky_sidebar":"1","share_position":"top","share_float_style":"share-monocrhome","show_share_counter":"1","show_view_counter":"1","show_featured":"1","show_post_meta":"1","show_post_author":"1","show_post_author_image":"1","show_post_date":"1","post_date_format":"default","post_date_format_custom":"Y\/m\/d","show_post_category":"1","show_post_reading_time":"0","post_reading_time_wpm":"300","post_calculate_word_method":"str_word_count","show_zoom_button":"0","zoom_button_out_step":"2","zoom_button_in_step":"3","show_post_tag":"1","show_prev_next_post":"1","show_popup_post":"1","number_popup_post":"1","show_author_box":"0","show_post_related":"0","show_inline_post_related":"0"}],"image_override":[{"single_post_thumbnail_size":"crop-500","single_post_gallery_size":"crop-500"}],"trending_post_position":"meta","trending_post_label":"Trending","sponsored_post_label":"Sponsored by","disable_ad":"0","subtitle":""},"jnews_primary_category":[],"jnews_social_meta":[],"jnews_override_counter":{"view_counter_number":"0","share_counter_number":"0","like_counter_number":"0","dislike_counter_number":"0"},"footnotes":""},"categories":[7],"tags":[450,2515,1465],"class_list":["post-78311","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-dr-jane-ruth-aceng","tag-health-ministry","tag-lubowa-hospital"],"_links":{"self":[{"href":"https:\/\/www.kfm.dembefm.ug\/staging_h\/wp-json\/wp\/v2\/posts\/78311"}],"collection":[{"href":"https:\/\/www.kfm.dembefm.ug\/staging_h\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.kfm.dembefm.ug\/staging_h\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.kfm.dembefm.ug\/staging_h\/wp-json\/wp\/v2\/users\/19"}],"replies":[{"embeddable":true,"href":"https:\/\/www.kfm.dembefm.ug\/staging_h\/wp-json\/wp\/v2\/comments?post=78311"}],"version-history":[{"count":0,"href":"https:\/\/www.kfm.dembefm.ug\/staging_h\/wp-json\/wp\/v2\/posts\/78311\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.kfm.dembefm.ug\/staging_h\/wp-json\/wp\/v2\/media\/72638"}],"wp:attachment":[{"href":"https:\/\/www.kfm.dembefm.ug\/staging_h\/wp-json\/wp\/v2\/media?parent=78311"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.kfm.dembefm.ug\/staging_h\/wp-json\/wp\/v2\/categories?post=78311"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.kfm.dembefm.ug\/staging_h\/wp-json\/wp\/v2\/tags?post=78311"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}