{"id":24308,"date":"2016-10-12T13:14:04","date_gmt":"2016-10-12T13:14:04","guid":{"rendered":"http:\/\/kfm.co.ug\/?p=24308"},"modified":"2016-10-12T13:14:04","modified_gmt":"2016-10-12T13:14:04","slug":"kcca-street-lights-project-querried","status":"publish","type":"post","link":"https:\/\/www.kfm.dembefm.ug\/staging_h\/kcca-street-lights-project-querried\/","title":{"rendered":"KCCA street lights project querried"},"content":{"rendered":"<p>A red flag has been raised over Kampala Capital City Authority\u2019s delays in installing 750 street solar lights in the city after the Shs. 7b project stalled a year ago.<\/p>\n<p>Government in October last year released Shs 7 billion to KCCA ahead of the November 27-29 papal visit to Uganda\u00a0 to change the entire LED lighting system to solar powered street lighting.<\/p>\n<p>The solar lights were meant to be installed along; Bombo Road, Kampala Road, Jinja, Mukwano Road, Nile Avenue, Kintu Road, Entebbe Road, Katwe-Kibuye among others.<\/p>\n<p>Many of these LED lighting systems were installed during the 2007 CHOGM preparations, but they later broke down.<\/p>\n<p>Philips East Africa Limited was procured and signed a contract on 22 October 2015 amidst criticism against KCCA by bidders, who poked holes in the procurement process.<\/p>\n<p>According to the information on the KCCA website, the contractor availed a work plan that committed to have the project delivered by 20 November, 2015, which was reflected in the signed contract.<\/p>\n<p>However towards the Pope\u2019s visit, KCCA noticed discrepancies in the information submitted by the contractor, where most of the information committed to previously was inconsistent with unfolding events.<\/p>\n<p>The contractor then went ahead to install temporary street lights as a stop gap measure ahead of the visit.<\/p>\n<p>KCCA deputy spokesperson, Robert Kalumba says they are in the final procurement process and that another contractor will be awarded the tender to complete the project.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A red flag has been raised over Kampala Capital City Authority\u2019s delays in installing 750 street solar lights in the city after the Shs. 7b project stalled a year ago. Government in October last year released Shs 7 billion to KCCA ahead of the November 27-29 papal visit to Uganda\u00a0 to change the entire LED lighting system to solar powered street lighting. The solar lights were meant to be installed along; Bombo Road, Kampala Road, Jinja, Mukwano Road, Nile Avenue, Kintu Road, Entebbe Road, Katwe-Kibuye among others. Many of these LED lighting systems were installed during the 2007 CHOGM preparations, but they later broke down. Philips East Africa Limited was procured and signed a contract on 22 October 2015 amidst [&hellip;]<\/p>\n","protected":false},"author":12,"featured_media":24306,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"episode_type":"","audio_file":"","cover_image":"","cover_image_id":"","duration":"","filesize":"","date_recorded":"","explicit":"","block":"","filesize_raw":"","jnews-multi-image_gallery":[],"jnews_single_post":[],"jnews_primary_category":[],"jnews_social_meta":[],"jnews_override_counter":[],"footnotes":""},"categories":[7],"tags":[],"class_list":["post-24308","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/www.kfm.dembefm.ug\/staging_h\/wp-json\/wp\/v2\/posts\/24308"}],"collection":[{"href":"https:\/\/www.kfm.dembefm.ug\/staging_h\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.kfm.dembefm.ug\/staging_h\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.kfm.dembefm.ug\/staging_h\/wp-json\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/www.kfm.dembefm.ug\/staging_h\/wp-json\/wp\/v2\/comments?post=24308"}],"version-history":[{"count":0,"href":"https:\/\/www.kfm.dembefm.ug\/staging_h\/wp-json\/wp\/v2\/posts\/24308\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.kfm.dembefm.ug\/staging_h\/wp-json\/wp\/v2\/media\/24306"}],"wp:attachment":[{"href":"https:\/\/www.kfm.dembefm.ug\/staging_h\/wp-json\/wp\/v2\/media?parent=24308"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.kfm.dembefm.ug\/staging_h\/wp-json\/wp\/v2\/categories?post=24308"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.kfm.dembefm.ug\/staging_h\/wp-json\/wp\/v2\/tags?post=24308"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}